Crossing December can make a construction agreement a long-term contract, but it does not automatically require the percentage-of-completion method. Section 460 contains exceptions, including qualifying home-construction contracts and certain other construction contracts meeting the completion-period and small-business tests. An exception still requires a permissible, consistently applied method.

A specific business-owner situation

An electrical business starts a short warehouse project in November and finishes in February. The owner assumes crossing the calendar year requires a new accounting system for every job.

Illustrative example, not a client result.

What to establish before filing

  1. Classify the construction activity.
  2. Test the relevant receipts and expected completion requirements.
  3. Compare the proposed method with prior returns.

Which fact changes the answer?

Expected completion time at contract inception and the statutory gross-receipts test are separate requirements for the small-contractor exception. Related entities can affect the receipts calculation.

A mistake to avoid

Small contract value alone does not establish eligibility for the exception.

Records that support the decision

  • Signed scope and expected schedule.
  • Gross-receipts aggregation workpaper.
  • Existing tax-method documentation.

The decision to document

Determine eligibility before choosing the method, then document any accounting-method change procedure needed.

Business-owner tax planning and coordination · Discuss your business and advisory needs

Related questions

Sources and editorial context

General educational information prepared with AI assistance. No individual professional review is claimed. Apply the relevant tax-year rules to the actual records. Editorial policy · AI disclosure.

Business Owners: Are You Overpaying on Taxes?

Get Your Free Tax Assessment